Utility Locating and Exploration

Provide utility locating and exploration for both public and private utilities on Charlotte Douglas International Airport (CDIA) property. This contract will include utility locating in areas both inside and outside of the Security Identification Display Area (SIDA).

Ramp Level Break Room Addition – Concourse A

The purpose of this contract will be for Concourse A Ramp Level Break Room Addition. This will add a break room and restroom for use of building maintenance staff. This will be a turnkey project for the addition one room and one restroom. This work is outlined in the narrative and drawings provided by AME Consulting Engineers. Contract term is 6 months.

SBE Targeted ITB: The City has established that this project will be targeted to City certified SBE firms only. Only firms registered and have an active SBE certification with the City of Charlotte can bid on this project.

Concourse D Widebody Ground Power Unit (GPU) Electrical Upgrades

The purpose of this solicitation is for the completion of Concourse D Widebody GPU Electrical Upgrades. This will consist of installing seven 150 amp circuits to feed new ground power units in order to support the widebody aircraft consistently parked at these gates.  The estimated contract erm is three months.

Terminal Lobby Expansion Furniture

Charlotte Douglas International Airport (“CLT” or “Airport”), which is owned and operated by the City of Charlotte, North Carolina (“City”), is seeking sealed Bids from qualified and experienced companies (individually or collectively, the “Bidder”) interested in providing Furniture for Terminal Lobby Expansion

Old Dowd Road Relocation

One of four remaining bid packages within the North End Around Taxiway Program. The relocation of Old Dowd Road includes the construction of one two-lane bridge over the Norfolk Southern Railway (NSRR), as well as retaining structures, civil site work, and approximately 3,800 feet of a two-lane roadway connecting existing Old Dowd Road directly to Wilkinson Boulevard. The work also includes demolition of the existing bridge over the NS railroad tracks at Marshall Drive and the construction of approximately 10,000 feet of 24-inch water main and the construction of a regional detention basin.

Airfield Wind Cone Replacement (Informal Bid)

The purpose of this project to remove four (4) existing wind cones located at the north and south ends of airfield at Charlotte Douglas International Airport and install four (4) new wind cones, provided by the Airport. Contractor is responsible to maintain a safe and clean operation and for security of all material and equipment while on site. Contractor is responsible to repair any items damage caused by work performed while on site. All staff assigned to project are required to be badge in accordance with airport security policy. Staff must properly display badge at all time, on the upper part of body visual to security and official members of the Airport. Any loss, damaged or stolen badges MUST be reported immediately to your airport contract.

Airport Ground Support Equipment

The acquisition of airport ground support equipment such as aircraft tug, belt loader, stair truck and lavatory service cart.  Contract term 3 years with optional renewal years.

Airfield Crack Sealing Repairs

Charlotte Douglas International Airport is seeking a contractor to perform crack sealing on CLT’s airfield. The work performed on the airfield will include working on runways, taxiways, aprons, and areas around the terminal ramp.
The working hours for this project will be from 11:15 pm to 5:30 am. The contractor will be required to provide all materials, equipment, labor to install crack sealant and cleaning for the work area. The airport will furnish and install