Concourses B and C Gate Modifications

 

The project scope includes the modifications to the arrangement of the gate counters at B concourse, gates B1-B4, and C concourse, gates C2-C5 & C7, to mitigate congestion at the north end of each concourse. The project also includes modifications required to existing partitions upon relocation of art walls, floor cores for power and data, and revised seating layouts.

Air Handler Unit 57 Replacement on Concourse C – POSTPONED

This will be a turnkey project. Company shall provide and install all new equipment and all associated materials to match the engineered drawings and specifications. Replace one air handler on C concourse according to drawings produced by engineer. Estimated time of completion is less than 6 months

CLT – On Call Demolition Services

The scope of this contract shall be to provide demolition and abatement services for removing various commercial and residential structures around the airport.

The term of the Contract shall be for three (3) years with two (2) optional one (1) year renewals.

CLT – ENVIRONMENTAL CONSULTING SERVICES

The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.

The term of the Contract shall be for three (3) years with two optional one-year renewals.

Airport Express Deck Sign Demolition

The Express Deck signage demolition will be a turnkey project for the removal and disposal of the sign assembly with the demolition of the supporting concrete columns, per construction drawings. The contract term of the shall be for a one-time purchase in which the project is estimated to be completed within 60 days.

Terminal Lobby Expansion Petrified Trees

Charlotte Douglas International Airport is seeking to purchase four (4) natural tree trunk/multi stem petrified Ficus trees for the interior main terminal lobby.

Baggage Handling System Masterplan

Perform a masterplan analysis of the baggage handling system at Charlotte Douglas International Airport.  This includes review of the existing baggage handling system, establishment of a forecast analysis and growth requirements, development of a masterplan with implementation strategies, and preparation of budget estimates.