Planning and Watershed Modeling

Scope of work is to coordinate with and assist City of Charlotte Storm Water Services Staff to provide project prioritization and watershed modeling services for the City’s drainage system. Storm drainage systems convey rainwater to reduce flooding, protect property, and ensure public safety. The City of Charlotte Storm Water Services is responsible for smaller streams and man-made drainage systems draining less than one square mile.

Asset Management and Long-Term Planning Services

Storm Water Services is seeking a firm to coordinate with and assist Storm Water Services Staff to develop, support and implement asset management and long-term planning services for the City’s drainage system. Storm drainage systems convey rainwater to reduce flooding, protect property, and ensure public safety. Storm Water Services is responsible for smaller streams and manmade drainage systems draining less than one square.

 

 

N Davidson St 2401 Storm Drainage Improvement Project

The existing pipes at the intersection of N Davidson St and 27th St were determined to be in very poor condition. This project will replace the existing three (3) pipes with one (1) large RCP culvert from the intersection of 27th St and N Davidson St, to the headwall located on the north side of N Davison St.

Professional Engineering Services for Various Storm Water Services Projects

 

Charlotte-Mecklenburg Storm Water Services (Storm Water Services) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company) to provide Various Storm Water Services Projects (Project). There are four Scopes of Services identified in this RFQ.  Companies may seek consideration for any and all Scopes of Services. The four Scopes of Services are as follows:

Scope of Service A: Stream Restoration Projects

The City anticipates selecting one firm to provide these services on a task order basis. Initial work will include design phase services for a project selected by the City. The Barringer Drive Stream and Wetland Restoration includes stream restoration (for inclusion in the City’s mitigation bank) and wetland restoration/enhancement on tributaries to Irwin Creek. Scoping is anticipated to start in 2022. The specific projects are as follows:

Barringer Drive Stream Restoration

 

Scope of Service B: Water Quality Improvement Projects

The City anticipates selecting one firm to provide these services on a task order basis. Initial work will include design phase services for a project selected by the City. The Sweden Road Water Quality Improvement Project is a City Facility retrofit project located at the CDOT – Street Maintenance Division Southwest District & Heavy Equipment Shop on 4600 Sweden Road. The project intends to improve stormwater runoff from the City Light Vehicle Maintenance shop by constructing a sand filter and a regenerative stormwater conveyance. Scoping is anticipated to start in early 2022. The specific projects are as follows:

Sweden Road WQ Improvement Project

 

Scope of Service C: Unspecified Stream Restoration Projects

The City anticipates selecting one (1) or more firms to provide these services on a task order basis. Initial work will include design for potential repairs identified through monitoring reports.  In addition, two (2) or more stream restoration projects which may begin in 2022.

 

Scope of Service D: Unspecified Pond and Dam Rehabilitation/Water Quality Improvement Projects

The City anticipates selecting one (1) or more firms to provide these services on a task order basis for two (2) or more pond and dam rehabilitation/water quality enhancement projects. This category may include project initiation planning for multiple projects that are not specified at this time. Additional tasks may include design services for repair of existing projects. These projects are anticipated to start scoping in 2022.

Briar Creek-Green Oaks Storm Drainage Improvement Project

The Briar Creek/Green Oaks Storm Drainage Improvement Project will replace failing infrastructure within an existing City Storm Water easement. Current failures of the existing culvert pose a threat to residents, vehicle traffic, and apartment homes. This project will replace, rehabilitate, and relocate the drainage system to ensure public safety within the easement.

 

Birmingham 6317 Storm Drain Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Ideal Way 816 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Foxwood Road 2727 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.