/ Opportunities Back to Home

aviation-bluet  Aviation / Commodities & Goods

Airport Main Terminal Bagroom Conveyor Upgrades

Details

Add to Calendar 2021-03-15 2021-03-15 Airport Main Terminal Bagroom Conveyor Upgrades

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.

 

Posting Number 2021-Q1(Jan-Mar)-AVI-4468

Anticipated Posting Date 2021-03-15

Commodity Code(s): 56005, 96246

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.

 

Requirements

Last Updated: 04/26/21
Estimated Total Value+
Contract Term+
Insurance Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Crystal Bailey

City Contact

cibailey@cltairport.com