Airport Surveillance Radar (Design Services)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-30 2024-04-30 Airport Surveillance Radar (Design Services)

The Airport Surveillance Radar (ASR) Relocation Project will relocate the existing ASR, located at the Mid-Field area at CLT Airport to a new proposed location near the proposed Airport Overlook Site. The project will consist of site work, tower work, site utilities, and a storage building

The selected Final Design Engineer or Engineer of Record (EOR or Consultant) will produce Construction Documents to be issued for competitive bidding of one or multiple construction packages, followed by Conformed or Released for Construction Plans issued to the responsive or responsible bidder for Construction.  The design and documents are to be based on Preliminary Design or bridging documents prepared by the Owner’s Master Civil Engineer (Aviation Consulting Engineers, LLC, or ACE).  The Preliminary Design effort will include completion of the Design Geotechnical Subsurface Investigation, preliminary design plans to a 30% level of completion, pavement design, and preliminary surveys.  Final Design surveys, including pavement tie-ins, etc. will be the responsibility of the Consultant.

Posting Number 2024-Q2(Apr-Jun)-AVI-8872

Anticipated Posting Date 2024-04-30

Commodity Code(s): 91842, 92517, 92536

The Airport Surveillance Radar (ASR) Relocation Project will relocate the existing ASR, located at the Mid-Field area at CLT Airport to a new proposed location near the proposed Airport Overlook Site. The project will consist of site work, tower work, site utilities, and a storage building

The selected Final Design Engineer or Engineer of Record (EOR or Consultant) will produce Construction Documents to be issued for competitive bidding of one or multiple construction packages, followed by Conformed or Released for Construction Plans issued to the responsive or responsible bidder for Construction.  The design and documents are to be based on Preliminary Design or bridging documents prepared by the Owner’s Master Civil Engineer (Aviation Consulting Engineers, LLC, or ACE).  The Preliminary Design effort will include completion of the Design Geotechnical Subsurface Investigation, preliminary design plans to a 30% level of completion, pavement design, and preliminary surveys.  Final Design surveys, including pavement tie-ins, etc. will be the responsibility of the Consultant.

Requirements

Last Updated: 01/24/24
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com