/ Opportunities Back to Home

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Briar Creek-Green Oaks Storm Drainage Improvement Project

Details

Add to Calendar 2021-12-01 2021-12-01 Briar Creek-Green Oaks Storm Drainage Improvement Project

The Briar Creek/Green Oaks Storm Drainage Improvement Project will replace failing infrastructure within an existing City Storm Water easement. Current failures of the existing culvert pose a threat to residents, vehicle traffic, and apartment homes. This project will replace, rehabilitate, and relocate the drainage system to ensure public safety within the easement.

 

Posting Number 2021-Q4(Oct-Dec)-CSWS-7288

Anticipated Posting Date 2021-12-01

Commodity Code(s): 74505, 91200, 91244, 92912, 92915

The Briar Creek/Green Oaks Storm Drainage Improvement Project will replace failing infrastructure within an existing City Storm Water easement. Current failures of the existing culvert pose a threat to residents, vehicle traffic, and apartment homes. This project will replace, rehabilitate, and relocate the drainage system to ensure public safety within the easement.

 

Requirements

Last Updated: 01/04/22
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov