Catawba Pump Station Rehabilitation Project

Details

Add to Calendar 2021-01-05 2021-01-05 Catawba Pump Station Rehabilitation Project

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/ replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes the replacement of the existing roofing system at the Generator Building with a new modified 3-ply built up roofing system.

Posting Number 2021-Q1(Jan-Mar)-CW-2782

Anticipated Posting Date 2021-01-05

Commodity Code(s): 90976, 91240, 91438, 91450, 91450, 91468, 91485, 92967

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/ replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes the replacement of the existing roofing system at the Generator Building with a new modified 3-ply built up roofing system.

Requirements

Last Updated: 11/16/20
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov