charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective L (Knightwood, Fair Valley)

Details

Add to Calendar 2021-12-03 2021-12-03 Collective L (Knightwood, Fair Valley)
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 2 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after the review is complete.

Posting Number 2021-Q4(Oct-Dec)-CSWS-7052

Anticipated Posting Date 2021-12-03

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 2 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after the review is complete.

Requirements

Last Updated: 11/03/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+