Collective Storm Drainage Improvement Projects Series G

Details

Add to Calendar 2020-10-19 2020-10-19 Collective Storm Drainage Improvement Projects Series G

This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.

Posting Number 2020-Q4(Oct-Dec)-DGS-2583

Anticipated Posting Date 2020-10-19

Commodity Code(s): 91345

This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.

Requirements

Last Updated: 11/02/20
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Sheltered Market Solicitation+
Subcontracting Opportunities+
Special Notes

n/a

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Sadia Khan

City Contact

skhan@charlottenc.gov