charlotte-water-bluet  Charlotte Water / Construction

Dixie River Road Watermain

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2022-Q3(Jul-Sep)-CW-6662

Anticipated Posting Date 2022-07-11

Commodity Code(s): 91319, 91345, 91356, 91396

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1982

Charlotte Water (CLTWater) will extend drinking water pipes along Dixie River road from 5900 block of Dixie River Rd to Sadler Road. Construction is scheduled to start in early 2022 and will be complete by early 2023.

Requirements

Last Updated: 07/14/22
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background