/ Opportunities Back to Home

aviation-bluet  Aviation / Construction

Ground Power Circuit Upgrades

Details

Add to Calendar 2021-10-20 2021-10-20 Ground Power Circuit Upgrades

The intent of this project is to add the required circuits needed to add an additional 90KVA ground power unit to the existing loading bridges B9, B12, B13, B16. The new electrical circuits will be run-up to the rotunda at each loading bridge and terminated in a fused disconnect per the BR+A drawings. The contract term will be eight (8) months.

Posting Number 2021-Q4(Oct-Dec)-AVI-6754

Anticipated Posting Date 2021-10-20

Commodity Code(s): 91082, 91438

The intent of this project is to add the required circuits needed to add an additional 90KVA ground power unit to the existing loading bridges B9, B12, B13, B16. The new electrical circuits will be run-up to the rotunda at each loading bridge and terminated in a fused disconnect per the BR+A drawings. The contract term will be eight (8) months.

Requirements

Last Updated: 11/10/21
Estimated Total Value+
Contract Term+
Insurance Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Crystal Bailey

City Contact

cibailey@cltairport.com