charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

High Ridge (4101) Storm Drainage Improvement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-15 2024-04-15 High Ridge (4101) Storm Drainage Improvement Project

The purpose and need for the construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Posting Number 2024-Q2(Apr-Jun)-CSWS-3447

Anticipated Posting Date 2024-04-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The purpose and need for the construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Requirements

Last Updated: 03/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jenny Burgett

City Contact

jburgett@charlottenc.gov