/ Opportunities Back to Home

aviation-bluet  Aviation / General Services

HVAC Replacements at Wilson Air Main Terminal

Details

Add to Calendar 2021-12-01 2021-12-01 HVAC Replacements at Wilson Air Main Terminal

This solicitation will involve replacing split system air conditioning units and reheat coils according to drawings produced by engineer. There are five (5) split systems along with twenty-five (25) reheat coils to be replaced. This equipment was installed during the original construction of the building. In this project, we are replacing the entire system, including the controls. This project is estimated to be less than 6 months.

Posting Number 2021-Q4(Oct-Dec)-AVI-4128

Anticipated Posting Date 2021-12-01

Commodity Code(s): 91450

This solicitation will involve replacing split system air conditioning units and reheat coils according to drawings produced by engineer. There are five (5) split systems along with twenty-five (25) reheat coils to be replaced. This equipment was installed during the original construction of the building. In this project, we are replacing the entire system, including the controls. This project is estimated to be less than 6 months.

Requirements

Last Updated: 06/21/21
Estimated Total Value+
Contract Term+
Insurance Requirements+

Follow This Opportunity!