/ Opportunities Back to Home

charlotte-water-bluet  Charlotte Water / Construction

Mallard WRF Upgrades, Phase 1

Details

Add to Calendar 2021-01-23 2021-01-23 Mallard WRF Upgrades, Phase 1

Phase 1 WRF Upgrade will increase the capacity of the facility to 14.9 million gallons per day (MGD) and includes a new deeper influent pump station to accept flow from a new, deeper trunk sewer, flow equalization, influent screens, aeration control and chemical feed.  The estimated construction cost for this upgrade is $65.2 million. The Phase 1 construction project will also include solids improvements that are estimated at $24 million.  Both aspects of the project will be delivered together as a single construction project.

Posting Number 2021-Q1(Jan-Mar)-CW-3601

Anticipated Posting Date 2021-01-23

Commodity Code(s): 91200

Phase 1 WRF Upgrade will increase the capacity of the facility to 14.9 million gallons per day (MGD) and includes a new deeper influent pump station to accept flow from a new, deeper trunk sewer, flow equalization, influent screens, aeration control and chemical feed.  The estimated construction cost for this upgrade is $65.2 million. The Phase 1 construction project will also include solids improvements that are estimated at $24 million.  Both aspects of the project will be delivered together as a single construction project.

Requirements

Last Updated: 01/12/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov