/ Opportunities Back to Home

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

McAlpine SR2 and SR3 Stream Repairs – CANCELLED

Details

Add to Calendar 2021-03-01 2021-03-01 McAlpine SR2 and SR3 Stream Repairs – CANCELLED

The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries.  Failing structure will be replaced or repaired such that they function as originally intended.  Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed.  Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.

This will not be bid

 

Posting Number 2021-Q1(Jan-Mar)-CSWS-1519

Anticipated Posting Date 2021-03-01

Commodity Code(s): 96273, 98814

The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries.  Failing structure will be replaced or repaired such that they function as originally intended.  Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed.  Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.

This will not be bid

 

Requirements

Last Updated: 05/28/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov