aviation-bluet  Aviation / Construction

North End Around Taxiway Early Cabling Project has been combine – CANCELLED

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2022-Q2(Apr-Jun)-AVI-7135

Anticipated Posting Date 2022-04-25

Commodity Code(s): 90567, 92975, 93625, 96218

One of seven remaining bid packages within the North End Around Taxiway Program. The construction of the NEAT Early Cabling Project provides for temporary direct-buried power cables from the existing power transformer at the existing RW 36C Approach Localizer Emergency Generator to the existing transformer at the existing Runway 18C Approach Glideslope Shelter in locations with minimal impacts from the proposed NEAT 1st Package construction within the NEAT program.

Requirements

Last Updated: 01/26/22
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com