/ Opportunities Back to Home

aviation-bluet  Aviation / Construction, General Services

North End Around Taxiway Grading & Drainage – Construction

Details

Add to Calendar 2021-07-30 2021-07-30 North End Around Taxiway Grading & Drainage – Construction

One of seven bid packages within the North End Around Taxiway Program. This package includes the major grading, drainage, utility and NAVAIDS relocations required by the NEAT.  The modifications to the NAVAIDS include a localizer relocation, modifications to multiple MALSR light stations, new NAVAID shelters and the relocation of an ASOS. These include, but are not limited to, the following: (i) Runway 36C Localizer; (ii) Runway 18C Medium Intensity Approach Light System (MALSR); (iii) Runway 18C Precision Approach Path Indicator (PAPI).  These relocations will require full communication (fiber) connections to the airport fiber system and back-up power.

Posting Number 2021-Q3(Jul-Sep)-AVI-3116

Anticipated Posting Date 2021-07-30

Commodity Code(s): 91223

One of seven bid packages within the North End Around Taxiway Program. This package includes the major grading, drainage, utility and NAVAIDS relocations required by the NEAT.  The modifications to the NAVAIDS include a localizer relocation, modifications to multiple MALSR light stations, new NAVAID shelters and the relocation of an ASOS. These include, but are not limited to, the following: (i) Runway 36C Localizer; (ii) Runway 18C Medium Intensity Approach Light System (MALSR); (iii) Runway 18C Precision Approach Path Indicator (PAPI).  These relocations will require full communication (fiber) connections to the airport fiber system and back-up power.

Requirements

Last Updated: 12/02/20
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com