One of seven bid packages within the North End Around Taxiway Program. The construction of the Private Access Drive includes constructing approximately 3,700 feet of a two-lane roadway from the existing traffic roundabout adjacent to the Fuel Farm, along the Long Term 1 Parking Lot and Duke Energy property line and connecting to Wilkinson Boulevard with a redesigned intersection at Barry drive. This project includes utility relocations, roadway lighting, drainage, new water main and additional parking areas within Long Term 1.
Posting Number 2021-Q2(Apr-Jun)-AVI-3106
Anticipated Posting Date 2021-04-26
Commodity Code(s): 91310
One of seven bid packages within the North End Around Taxiway Program. The construction of the Private Access Drive includes constructing approximately 3,700 feet of a two-lane roadway from the existing traffic roundabout adjacent to the Fuel Farm, along the Long Term 1 Parking Lot and Duke Energy property line and connecting to Wilkinson Boulevard with a redesigned intersection at Barry drive. This project includes utility relocations, roadway lighting, drainage, new water main and additional parking areas within Long Term 1.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
Tweets by EarlyBirdCLT