/ Opportunities Back to Home

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Riverbend Storm Drainage Improvement Project

Details

Add to Calendar 2023-02-14 2023-02-14 Riverbend Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.

Posting Number 2023-Q1(Jan-Mar)-CSWS-8347

Anticipated Posting Date 2023-02-14

Commodity Code(s): 74505, 91200, 91345, 91430, 92912, 92915, 96884, 98814

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.

Requirements

Last Updated: 04/25/22
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov