/ Opportunities Back to Home

engineering-property-management-bluet  Department of General Services / Construction

Shade Valley Realignment Project

Details

Add to Calendar 2021-05-01 2021-05-01 Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Posting Number 2021-Q2(Apr-Jun)-DGS-5000

Anticipated Posting Date 2021-05-01

Commodity Code(s): 74505, 91200, 91219, 91244, 91319, 91347, 91361, 91430, 96239, 98852

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Requirements

Last Updated: 04/23/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Danielle Fisher

City Contact

danielle.fisher@charlottenc.gov