/ Opportunities Back to Home

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Shamrock Gardens Storm Drainage Improvement Project

Details

Add to Calendar 2022-03-15 2022-03-15 Shamrock Gardens Storm Drainage Improvement Project

This construction project is located near Eastway Dr. and Shamrock Dr and involves addressing a deteriorated corrugated metal pipe system located within the Shamrock Gardens Apartment complex as well as flooding of multiple roadway crossings. An analysis of existing conditions will be performed to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, and design and construction of needed improvements. The Shamrock Gardens Storm Drainage Improvement Project is bordered by Purser Drive to the north, Shamrock Drive to the south, Briar Creek to the east and Eastway Drive to the west.

Posting Number 2022-Q1(Jan-Mar)-CSWS-3461

Anticipated Posting Date 2022-03-15

Commodity Code(s): 91200

This construction project is located near Eastway Dr. and Shamrock Dr and involves addressing a deteriorated corrugated metal pipe system located within the Shamrock Gardens Apartment complex as well as flooding of multiple roadway crossings. An analysis of existing conditions will be performed to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, and design and construction of needed improvements. The Shamrock Gardens Storm Drainage Improvement Project is bordered by Purser Drive to the north, Shamrock Drive to the south, Briar Creek to the east and Eastway Drive to the west.

Requirements

Last Updated: 06/04/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov