/ Opportunities Back to Home

charlotte-department-transportation-bluet  Charlotte Department of Transportation / Construction

South Tryon St Intelligent Transportation System

Details

Add to Calendar 2020-12-02 2020-12-02 South Tryon St Intelligent Transportation System

This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.

Posting Number 2020-Q4(Oct-Dec)-CDT-3421

Anticipated Posting Date 2020-12-02

Commodity Code(s): 96218

This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.

Requirements

Last Updated: 06/16/21
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Sadia Khan

City Contact

skhan@charlottenc.gov