/ Opportunities Back to Home

charlotte-water-bluet  Charlotte Water / Construction

Sugar Creek 78” Sanitary Sewer Rehabilitation Project

Details

Add to Calendar 2021-05-07 2021-05-07 Sugar Creek 78” Sanitary Sewer Rehabilitation Project

The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.

Posting Number 2021-Q2(Apr-Jun)-CW-5332

Anticipated Posting Date 2021-05-07

Commodity Code(s): 91360

The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.

Requirements

Last Updated: 05/11/21
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov