/ Opportunities Back to Home

aviation-bluet  Aviation / Construction

Terminal Basement Rehabilitation (Cancelled)

Details

Add to Calendar 2021-04-01 2021-04-01 Terminal Basement Rehabilitation (Cancelled)

The Airport plans to rehabilitate the existing terminal basement as it has not been renovated since its original construction in the 1980s.  The Terminal Basement currently provides three prep kitchens in addition to storage for concessionaires in the terminal.  The rehabilitation will reconfigure the space to maximize the operation and update all life safety systems for this area.

Posting Number 2021-Q2(Apr-Jun)-AVI-3108

Anticipated Posting Date 2021-04-01

Commodity Code(s): 90900, 90910

The Airport plans to rehabilitate the existing terminal basement as it has not been renovated since its original construction in the 1980s.  The Terminal Basement currently provides three prep kitchens in addition to storage for concessionaires in the terminal.  The rehabilitation will reconfigure the space to maximize the operation and update all life safety systems for this area.

Requirements

Last Updated: 08/03/21
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com