charlotte-water-bluet  Charlotte Water / Construction

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2021-Q3(Jul-Sep)-CW-6673

Anticipated Posting Date 2021-08-26

Commodity Code(s): 65800, 91219, 91227, 91319, 91339, 91345, 91347, 91395, 96239, 96292, 96884, 98814, 98815, 98852

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1765

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Requirements

Last Updated: 09/21/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov