Uptown Cycle Track

Details

Add to Calendar 2020-10-16 2020-10-16 Uptown Cycle Track

The project includes implementation of a two-way separated cycle track in Uptown Charlotte along portion of 5th and 6th street. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.

Posting Number 2020-Q4(Oct-Dec)-DGS-2561

Anticipated Posting Date 2020-10-16

Commodity Code(s): 91327

The project includes implementation of a two-way separated cycle track in Uptown Charlotte along portion of 5th and 6th street. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.

Requirements

Last Updated: 11/16/20
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Sadia Khan

City Contact

skhan@charlottenc.gov