/ Opportunities Back to Home

engineering-property-management-bluet  Department of General Services / Construction

West Mallard Creek Church Road Shared- Use Path

Details

Add to Calendar 2022-02-08 2022-02-08 West Mallard Creek Church Road Shared- Use Path

This project is being built to add sidewalks as part of the city’s Capital Investment Fund to provide a safe, efficient, comfortable pedestrian system to improve the quality of life of its residents, visitors, and businesses. Improvements will be provided along the south side of West Mallard Creek  Church Road, from Mallard Creek Road to roughly 600′ east of Claude Freeman Drive. The project proposes a 12 ft. shared-use path, a typical 8 ft. planting strip (where possible), signalization and intersection improvements at David Taylor Drive, and intersection improvements at Claude Freeman Drive.

Posting Number 2022-Q1(Jan-Mar)-DGS-4986

Anticipated Posting Date 2022-02-08

Commodity Code(s): 91200

This project is being built to add sidewalks as part of the city’s Capital Investment Fund to provide a safe, efficient, comfortable pedestrian system to improve the quality of life of its residents, visitors, and businesses. Improvements will be provided along the south side of West Mallard Creek  Church Road, from Mallard Creek Road to roughly 600′ east of Claude Freeman Drive. The project proposes a 12 ft. shared-use path, a typical 8 ft. planting strip (where possible), signalization and intersection improvements at David Taylor Drive, and intersection improvements at Claude Freeman Drive.

Requirements

Last Updated: 05/19/21
Estimated Total Value+
Contract Term+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Danielle Fisher

City Contact

danielle.fisher@charlottenc.gov