charlotte-water-bluet  Charlotte Water / Construction

Zone 4 Field Operations Center (Construction Manager-at-Risk)

Details

Add to Calendar 2021-06-21 2021-06-21 Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Posting Number 2021-Q2(Apr-Jun)-CW-4743

Anticipated Posting Date 2021-06-21

Commodity Code(s): 90937, 91001, 91200, 91361, 91427, 91438, 91444, 91450, 91455, 91468, 92500, 98815, 98852

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Requirements

Last Updated: 06/28/21
Estimated Total Value+
Contract Term+
Utilization+
Insurance Requirements+
Bonding Requirements+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

For Questions, Contact:

Markeyia Dobbs

City Contact

Markeyia.Dobbs@charlottenc.gov