Dukes Reliability and Residuals

This will be a request for qualification for Design Services. The project scope includes; new clarifier, new thickener, filter replacement, electric and piping upgrades, etc. Anticipated 16 month design with 20 month construction.

On-Call Materials Testing

As part of the airfield master plan efforts to repair runways, taxiways, shoulders, and apron materials testing is needed to meet inspection requirements for placement of concrete and asphalt. The project includes inspection sample cores and final data reports for all pavement materials placed on the airfield. All work shall conform to FAA circular requirements.

Concourse C International Gates Connector (Canceled)

Airport will seek qualifications for Architecture/Engineering consultant services for the addition of circulation pathways to connect up to 8 existing aircraft gates in Concourse C with the Federal Inspection Station (FIS) located in Concourse D.  Services will include concept development (including architectural planning and site planning), schematic design, design development, contract documents, bidding services, and construction administration.

Concourse A Expansion Phase III (Design)

Charlotte Douglas International Airport (CLT) is seeking a qualified airport consulting team to provide design and construction administration services (“Services”) for the third phase of gate expansions to Concourse A. It is essential that the design and configuration of the concourse has adequate aircraft parking depth, taxi lane circulation, and service vehicle circulation, in order to ensure an efficient operation, as well as provide flexibility for changes in aircraft fleet mix, design requirements, and potential changes in forecasted growth

Concourse C Expansion (Design)

Airport will seek qualifications for Architecture/Engineering consultant services for the expansion of Concourse C.  The project will develop approximately 300,000 square feet with up to 16 aircraft boarding gates.  Services will include concept development (including architectural planning and site planning), schematic design, design development, contract documents, bidding services, and construction administration.

Building Infrastructure Masterplan – ON HOLD

Perform a masterplan analysis of the base building infrastructure including, but not limited to, mechanical, electrical, plumbing, and fire protection systems at Charlotte Douglas International Airport for both the main terminal campus and all Airport-owned outlying buildings.  The masterplan development includes a review of the existing building infrastructural systems, establishment of a forecast analysis and growth requirements, development of implementation strategies, and preparation of budget estimates.

On-Call Material Testing and Special Inspections Services

The selected Firm(s) will provide materials testing and special inspection services (“Services”) for various federal and nonfederal funded projects initiated by Charlotte Douglas International Airport (“CLT”) via an on-call basis. CLT will assign Services to the Firm through individual Task Order Documents.

Firms shall conduct general materials testing tasks in accordance with industry accepted standards and practices as well as the requirements of CLT, the Federal Aviation Administration, North Carolina Department of Transportation and City of Charlotte standards. Examples of Federal Aviation Administration standards include but are not limited to P-401/403 (Asphalt) and P-501 (Concrete). Materials testing will be to independently verify site/material conditions to allow work to proceed with confidence. Materials testing services may also include construction observation, report writing and quantity measurements.

Franklin Water Treatment Plant Main Building Renovations

This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 will include technology requests (Supervisory Control and Data Acquisition system, security, etc.), construction phasing/planning office spaces, finishings, exterior and landscaping. Phase 4 will include project permitting and construction admin services. There is a potential for the renovations to be broken up into smaller projects after Phase 1 is complete.

Miscellaneous Geotechnical and Environmental Services Request for Quotation -CANCELLED

Charlotte Water will be requesting submittals from qualified firms interested in providing miscellaneous geotechnical and environmental services on an as-needed basis. Charlotte Water’s Engineering division frequently manages projects that benefit from the use of on-call geotechnical and/or environmental testing and/or evaluation services during the design or construction stages. Firms will have to indicate whether they would like to be considered for miscellaneous Geotechnical Services, Environmental Services or both.

This opportunity has been cancelled as of 1/18/2024.