Professional Engineering Services for Emergency and Routine Repair Services

Charlotte Water is soliciting Statement of Qualifications from qualified engineering firms to provide survey, design, contract administration, construction inspection services, and other engineering services as requested.  The engineering services requested will be for routine and emergency water distribution and collection system repair projects.

Concourse D/E Connector Renovations (Design)

Repositioning the major passenger circulation route of the D/E connector between the Atrium to the end of the moving walkways at the approach of Concourse D. Relocating the airline lounge space from the departure level to an upper-level location while expanding it to 40,000 square feet.  Providing a new passenger destination and experience at the departures level that will provide increased financial returns to the airport.  Providing a service area at the apron level to help with operations within the DECO area.

Professional Engineering Services for Various Storm Water Services Flood Mitigation Projects

Storm Water Services is requesting proposals from qualified companies interested in providing Professional Engineering Services for Various Storm Water Services flood mitigation projects.  The projects will be drainage area-based storm drainage improvement projects that involve differing land uses within the project areas.  Drainage basins may include closed and open systems.  The study areas may be on a portion of the watershed or entire watershed. (Up to 5 contracts)

On-Call Civil Engineering Consultant

Charlotte Douglas International Airport (CLT) is seeking statements of qualifications from professional engineering firms to provide task order engineering services. Services are expected to cover a range of smaller studies, conceptual designs, investigations, coordination processes and technical support of a limited nature.  This Engineering and Construction Task Order contract is focused largely but not exclusively on support to “horizontal/flat-work” design engineering and construction support services for engineering.

West Boulevard Relocation (Design)

This project is associated with the Airport’s 4th Parallel Runway Project. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor.

The final Engineer of Record will start their services at 30%, by utilizing preliminary plans from the Master Civil Engineer

4th Parallel Runway (Design)

This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow in and out of CLT.

The Final Engineer of Record will start their services at 30%, by utilizing preliminary plans from the Master Civil Engineer. CLT may select multiple engineering firms to work on the various aforementioned project elements.

Zone 2 Water Replacement Package 1

The purpose of Zone 2 Water Replacement Package project is to expand Charlotte Water’s ongoing water replacement program by expediting the replacement of older water mains that are of pipe materials known to have a high likelihood of failure. Through research of main break data, a group of neighborhoods have been identified with a high concentration of these water mains made from these pipe materials. This project will focus on the replacement of the galvanized steel pipe (GSP) and asbestos cement pipe (ACP) within the project area but will consider other mains within the scope areas as well if deemed necessary. For this project, Charlotte Water staff believes the Progressive Design-Build delivery method will be best.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.