Collective Series K Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of three small storm drain improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Graham Street Intelligent Transportation System (ITS) Project

This project will install approximately 2.5 miles of 72 count single-mode fiber optic cable installed in mostly existing conduit. There are also small portions of new directionally bored, hand-dug, and trenched conduit. This project includes entrances and communications equipment for six existing traffic signal control cabinets and the installation of seven traffic management cameras. The project limits are North Graham Street beginning at West Sugar Creek Road to Mallard Creek Road to West WT Harris Boulevard. This project includes fiber optic cable splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

FY22 Manhole Rehabilitation

Charlotte Water maintains over 100,000 sanitary sewer manholes. This contract will be utilized for the repair and renewal of sanitary sewer manholes. Rehabilitation efforts from this contract are expected to reduce inflow within Charlotte Water’s collection system.

East Boulevard Intelligent Transportation System (ITS) Project

This project will install approximately 1.53 miles of 36 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras. The project limits are East Boulevard beginning at Queens Road West to Euclid Avenue. This project also includes fiber splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

Storm Water Repair and Improvement FY 2022-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY 2022-C

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY 2022-B

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY2022-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Vest Water Treatment Plant Concrete Repairs

The Project consists of concrete repairs and coating applications in the south filter gallery gullets and south sedimentation basin flumes. Improvements to the flocculation basin effluent flumes, including installation of a concrete bulkhead and stop plates. Additional work includes hatch installations, miscellaneous concrete repairs throughout the facility, and miscellaneous small diameter pipe replacement.