McDonald Avenue (Culvert) Storm Drainage Improvement Project – CANCELLED

Cancel reason:

“This will be done as part of a design-build project: Dairy Branch Sewer Improvements.  I think this will be Phase 3 of that project.  The design-build team has already been selected and are currently working through their guaranteed max price (GMP) before they go to Council for approval.  We had a couple questions on the GMP for our part that the d-b team is working through.  I believe their intent is to go to Council in the next couple months with construction starting in summer/late summer, so probably not until FY23.”

The purpose and need for the construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Starvalley Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Severn (3739) Storm Drainage Improvement Project

This construction project is located in Beverly Woods and will improve the storm drainage infrastructure and repair failing infrastructure in order to reduce flooding of streets, properties and structures.

9th and College Storm Drainage Improvement Project

The 9th and  College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.

City View/McAlpine Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Louise Ave Storm Drainage Improvement Project

This construction project is located just east of downtown along an unnamed tributary to Little Sugar Creek on Louise Ave. The purpose and need for the project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

FY21-1 Sanitary Sewer Rehabilitation

This contract will be primarily used to repair sewer system defects that are allowing substantial rainwater and ground water (inflow and infiltration) to enter the sewer system.  The contract will also be used to repair significant structural defects that are causing re-occurring maintenance issues .

Sanitary Sewer Point Repair and Replacements

This contract is for the rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.

Atrium Life Safety and Rehabilitation (Construction)

The Terminal Atrium Life Safety and Renovation Project will include the installation of fire protection and life safety systems in the Atrium and Mezzanine.  The project will also include refurbishing finishes, new flooring, upgraded lighting, and signage and wayfinding.   There will also be addition of life safety measures and renovations to various other components in the Atrium portion of the Terminal Building.