3145 S. Tryon st. Chiller Replacement Project

Replace existing 160 Ton Air-cooled chiller with two smaller chiller units. One fore the Admin building and the other to support BOD Maintenance and body shops. This project is in response to failed chilled water piping the currently feeds the admin building. We currently have a rental chiller that is supplying the Admin building.

 

PSR-867