Airfield Wind Cone Replacement (Informal Bid)

The purpose of this project to remove four (4) existing wind cones located at the north and south ends of airfield at Charlotte Douglas International Airport and install four (4) new wind cones, provided by the Airport. Contractor is responsible to maintain a safe and clean operation and for security of all material and equipment while on site. Contractor is responsible to repair any items damage caused by work performed while on site. All staff assigned to project are required to be badge in accordance with airport security policy. Staff must properly display badge at all time, on the upper part of body visual to security and official members of the Airport. Any loss, damaged or stolen badges MUST be reported immediately to your airport contract.

On-Call Airfield Lighting Maintenance

The Facilities Department of Charlotte Douglas International Airport maintains the airfield, including runways and taxiways and the lights, signs, regulators, and control systems within the AOA. (Aircraft Operational Area). This includes a network of wire and conduit, including cans and manholes. This Contract will be an on-call as-needed basis. It will also include, not be limited to the following: power, distribution, lighting, conduit, panels, equipment connections, and high voltage. Most of this work will be in and on the airfield at Charlotte Douglas International Airport.

Private Access Drive (Construction)

This is one of seven bid packages within the North End Around Taxiway Program. The construction of the Private Access Drive includes constructing approximately 3,700 feet of a two-lane roadway from the existing traffic roundabout adjacent to the Fuel Farm, along the Long Term 1 Parking Lot and Duke Energy property line and connecting to Wilkinson Boulevard with a redesigned intersection at Barry drive.  This project includes utility relocations, roadway lighting, drainage, new water main and additional parking areas within Long Term 1. The purpose of this project is to construct a new access drive along the western edge of Long Term #1 parking lot to allow Long Term #1 exiting customers access to Wilkinson Blvd as well as access for terminal deliveries and Gate 80 traffic. This work will include roadway, storm drainage, traffic signal, fiber installation, parking lot, water and sewer relocation, and landscaping. The project will include work on Charlotte (CLT) owned property as well as NCDOT owned facilities. Completion of this project allows CLT Airport to take a portion of Old Dowd road out of service for North End Around Taxiway improvements.