This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Upgrade iNit Light Rail Passenger Count Software
Upgrade CATS Light Rail Passenger Count Solution software to a version compatible with newer Microsoft Operating Systems.
Gold Line Phase 2 Traffic Signal Parts
The City of Charlotte is looking for a company to provide Traffic Signal Parts, including the pedestrian signals and controllers for the Charlotte Area Transit System Gold Line Phase 2 project.
Gold Line Phase 2 Traffic Signal Cabinets and APS Parts
The Charlotte Area Transit System is seeking to acquire Traffic Signal Cabinets, Risers and Accessible Pedestrian Signal (APS) parts for the Gold Line Phase 2 project. These items are required to be interchangeable and function with the existing infrastructure used by the Charlotte Department of Transportation.