Cancelled – Hitachi Rail STS Inventory Spare Parts and Repair Service Contract

Light Rail Train Control and Signaling Systems. The parts that are being purchased under this contract are for replacement parts and inventory stock spares required to maintain the tracks signaling system, grade crossings and train control.

This was a sole source and should not have been entered in EarlyBird

PSR-1055

Gold Line Phase 2 Traffic Signal Parts

The City of Charlotte is looking for a company to provide Traffic Signal Parts, including the pedestrian signals and controllers for the Charlotte Area Transit System Gold  Line Phase 2 project.

Gold Line Phase 2 Traffic Signal Cabinets and APS Parts

The Charlotte Area Transit System is seeking to acquire Traffic Signal Cabinets, Risers and Accessible Pedestrian Signal (APS) parts for the Gold  Line Phase 2 project.   These items are required to be interchangeable and function with the existing infrastructure used by the Charlotte Department of Transportation.