Collective AF Storm Drainage Improvement Project:

Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.                

Storm Water Repair and Improvement FY2024-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve: mobilization, earthwork, drainage structures,  storm drain pipe systems, and channels.   Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY2024-C

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Marlwood/Waverly (Dredging) Surface Water Quality Improvement Project

The Marlwood/Waverly project area consists of the two ponds, Marlwood Lake located south of Albemarle Road near Marlwood Circle, and Waverly Lake located north of Albemarle Road near Almond Road. The existing ponds have silted in and project improvements include pond dredging to specified projects depths.

Newell Stream Restoration Project

The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.

Collective AC Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr.  1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr.  10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge.  1127 Willhaven Dr will consist of reinforced concrete pipe and drainage structure installation, ditch grading, full-depth asphalt replacement as well as curb and gutter replacement along Willhaven Drive.  There will be 2 culvert replacements not located along Willhaven Drive, 1 will be a driveway culvert located at 5328 Randolph Rd and the other will be crossing under Crestbrook Drive.  Both culverts will consist of reinforced concrete pipe, drainage structures, asphalt replacement, and channel grading.  The culvert under Crestbrook Drive will also require curb and gutter as well as sidewalk replacement.

 

Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.