The Valet Parking Upfit Project at Charlotte Douglas International Airport relocates the temporary valet parking location to a new permanent premium service valet parking operation and experience for the CLT passengers at the basement level of the Hourly Deck. The Valet Parking Upfit Project will include a customer transaction counter, customer waiting area, key storage room with passthrough window, employee breakroom, storage closet, four automatic glass sliding doors, paint and finishes in the Terminal and Parking Area, signage, hardware, and misc. equipment.
Coffey Creek (Construction)
Work involves construction of a 400 linear foot sub-surface impermeable wall, two (2) observation wells, and four (4) monitoring wells. The wall will be constructed parallel to, and in close proximity to an active stream. This project is within the secure area of the airport.
Concourses D & E Conveying Systems Replacements
The project will consist of replacement of 3 moving walkways in Concourse E and modernization of 5 Escalators in Concourse D. The projects may be separate or combined. Minor electrical and waterproofing may be a part of the Concourse D escalator modernization project.
978 Zone Water Transmission Main and Booster Pump Station-CANCELLED
CLT CENTER PHASE 14 (Construction)
The interior renovation within the CLT Center (Operations Center) to include new office space for a tech help suite, conference room, video editing room, and cell phone tech office. The project consists of approximately 2,500 sf and will be built in two (2) phases.
Upper Little Sugar Creek Interceptor Design
Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard). The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.
CLT Historic Hangar Shell Renovation
Renovations to the Historic Hangar including removal and replacement of metal roof and wall panels, and painting wall panels including a Preferred Brand Alternate. Electrical scope includes removal of existing exterior incandescent flood lights and replacing with new custom manufactured LED light fixtures reusing the existing electrical circuitry.
Concourse E Renovation (Construction Grant Funded)
Renovations to the public areas including replacement of moving walkways, toilet room renovation and expansion, terrazzo installation in the common circulation areas, ceiling replacement, new wayfinding signage and mechanical, plumbing and electrical work as required to support the renovation.
This Contract is subject to the requirements of 49 CFR Part 26 – Participation by DBE in Department of Transportation Financial Assistance Programs and the City’s DBE Program. The City’s DBE program, DBE program instructions, and DBE forms can be found at:
https://www.cltairport.com/business/business-diversity-programs/dbe-program/
The City has established a Disadvantaged Business Enterprise (DBE) participation goal of Twelve Percent (12.00%) for this contract. Subcontracting firms must be DBE certified through NCDOT to count towards participation.
For questions regarding the DBE participation goal, please contact CLT Airport’s Office of Civil Rights Manager, Jasmyne Turman, at jasmyne.turman@cltairport.com.
CTC Redevelopment – Design Reimbursement – CANCELLED
The Charlotte Area Transit System (CATS) Charlotte Transportation Center (CTC) Redevelopment Project will construct a mixed-use development through a public-private partnership.
White Point previously purchased a 1.2-acre, half city block directly across the street from the CTC. This 1.2-acre property will be used to construct a temporary facility while the new structure is built at the existing location
The project will be achieved through a White Point partnership with CATS, coordination with City of Charlotte departments and stakeholders as well as communication with nearby property owners.
PSR # 1470