On-Call Material Testing and Special Inspections Services

The selected Firm(s) will provide materials testing and special inspection services (“Services”) for various federal and nonfederal funded projects initiated by Charlotte Douglas International Airport (“CLT”) via an on-call basis. CLT will assign Services to the Firm through individual Task Order Documents.

Firms shall conduct general materials testing tasks in accordance with industry accepted standards and practices as well as the requirements of CLT, the Federal Aviation Administration, North Carolina Department of Transportation and City of Charlotte standards. Examples of Federal Aviation Administration standards include but are not limited to P-401/403 (Asphalt) and P-501 (Concrete). Materials testing will be to independently verify site/material conditions to allow work to proceed with confidence. Materials testing services may also include construction observation, report writing and quantity measurements.

Mallard Creek Water Reclamation Facility (WRF) & Lee S. Dukes Water Treatment Plant (WTP) Standby Power & Electrical Improvements – Cancelled

The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.