Cathodic Protection for North Yard Mop Sinks

The contractor shall install an impressed current cathodic protection for the copper lines for mop sinks in North Yard as shown in the drawings and per the project special provisions. The scope of work includes but not limited to: Installation, Startup and Survey.

 

 

PSR-779

Terminal Basement Rehabilitation (Cancelled)

The Airport plans to rehabilitate the existing terminal basement as it has not been renovated since its original construction in the 1980s.  The Terminal Basement currently provides three prep kitchens in addition to storage for concessionaires in the terminal.  The rehabilitation will reconfigure the space to maximize the operation and update all life safety systems for this area.