Concourse E Moving Walkways

This project is to install three pair of new moving walkways on Concourse E at Charlotte Douglas International Airport (“CLT”). The Contractor shall provide new conveying systems that will work with the existing pit conditions and configurations, noting that one pair will be shortened by approximately 30’ to improve passenger circulation. Removal and disposal of the moving walkways, temporary infill of the of the existing pits, and pit modifications required to the first pair of moving walkways (E-MW-01/E-MW-02) are part of the separate Concourse E Renovations project (currently underway) and thus are not part of this scope of work. As such, it is imperative that the Contractor closely coordinate with the Concourse E Renovations project through the CLT project manager.