Fire Station #35 HVAC Renovation

This project will renovate the existing HVAC System, Controls and Water heaters for Charlotte Fire Station 35. The scope of work includes removal and disposal of the existing mechanical system ductwork, furnaces, condensers, and dedicated outdoor air unit and installation of new mechanical split system
Dx/Furnaces and air distribution, and reconnect with existing DDC controls.

Condenser Water Loop System – Concourse E- Phase 9 – Sycamore Brewing & PDQ

The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers. Contract term 90 days.