Concourse E – Hot Water Piping Relocation

This project is to relocate the heating hot water piping from under the ramp pavement and concourse floor and reconnect in the terminal ceiling space. 60% night work, 40% daytime work.  Project term will be 150 days.

 

Condenser Water Loop System – Concourse E- Phase 9 – Sycamore Brewing & PDQ

The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers. Contract term 90 days.

Canceled COVID Handsfree Plumbing Fixtures

Using an existing contract to perform work.

As a part of COVID-19 prevention the City of charlotte General Services has started an initiative to replace all city bathroom fixtures with hands free devices to reduce the amount of contact required when using facilities. This project will replace all sink faucets, toilet flush mechanisms, and add bottle fillers at the bathrooms located in South Tryon Bus Facility, North Davidson Bus Facility, Charlotte Transportation Center, North Rail yard and South Boulevard Light Rail Facility.

PSR 1126