Sunset Elevated Water Storage Tank

This project consists of constructing one new elevated storage tank 2 MG (million gallons in size). There will be waterline work associated to extend the mainline to the tank site. The selected firm would be asked to provide clearing and grading services in preparation of the tank installation.

Stowe Regional WRRF Northern Access Road

The Project is for the construction of a new access road to the Long Creek Pump Station and the proposed Stowe Regional Water Resource Recovery Facility (WRRF).  The Northern Access Road consists of approximately 5,500 linear feet of paved open-shoulder roadway with 2-12 feet travel lanes and a dual 8’x7’ reinforced concrete box culvert carrying Long Creek Tributary #1 to its confluence with Long Creek.

I-85 North Bridge

This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.

I-85 North Bridge (Rebid)

This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.

Monroe Road Streetscape

Improves Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and installs a pedestrian hybrid beacon in front of Time Out Youth Center.

Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk

This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Rd from Little Rock Rd to West Mecklenburg High School, and along the north side of Tuckaseegee Rd from Burkholder Road to Toddville Road.

Idlewild/ Rama/ Monroe Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Airport Tree Clearing

As part of the 4th Parallel Runway project, the Airport will solicit bids for tree clearing, erosion and sediment control. While the final bid package will contain exact line items, it is anticipated for the tree clearing to be roughly 160 acres. The tree clearing will consist of setting perimeter erosion control measures, cutting and hauling off of timber, but will not include any grubbing, clearing or grading.

Elevated Water Storage Tanks (Cancelled)

This project consists of constructing two new elevated storage tanks. The first tank will be called the Woodlawn Tank with a size of 3 MG (million gallons).    The second tank will be called the Sunset Tank with a size of 2 MG (million gallons). There will be waterline work associated to extend the mainlines to the tank site. The construction site will require grading and clearing in preparation of the tank installation.