Condenser Water Loop System – Concourse E- Phase 9 – Sycamore Brewing & PDQ

The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers. Contract term 90 days.