Remount Road and West Boulevard Intersection Improvements

The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative pavers, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.

Margaret Wallace Road Sidewalk (Summerfield Ridge Lane to Marshbrooke Road)

This project will install a 6′ concrete sidewalk, 8′ planting strip, concrete curb ramps, Pedestrian Refuge Island, concrete driveways, 2′-6″ concrete curb and gutter, storm drainage systems, and street trees along Margaret Wallace Road from Summerfield Ridge Lane to Marshbrooke Road. The project length is 1,900 LF/0.40 miles.

Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

West Ramp Dual Taxi Lanes (Construction)

As part of the West Ramp Dual Taxilanes Project at CLT, this construction package will include widening of the ramp adjacent to Concourse A to allow parallel taxi operations.  The project includes erosion and sedimentation control, grading, drainage, pipe lining of a large drainage pipe, installation of new airfield concrete, full-depth replacement of portions of existing airfield concrete, asphalt paving, marking, and airfield lighting/signage.

4th Parallel Runway Package 2: Runway

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.

4th Parallel Runway Package 4: NAVAIDs

To support CLT’s Fourth Parallel Runway Program, this project will include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure.  The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.

North End-Around Taxiway (NEAT) Extension

As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the north end of new Runway 1C-19C and existing Runway 18C-36C.  This project will construct the North End-Around Taxiway (NEAT).  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the NEAT.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.