Cedar St Storm Drainage Improvement Project

This project is located on South Cedar Street between Stadium View Drive and Westmere Avenue. The existing drainage system consists of a culvert under a city-maintained road. The improvements include culvert and pipe system upgrades.

 

Delane Ave 1220 Storm Drainage Improvement Project

The Delane Ave 1220 storm drainage improvement project will make drainage improvements along Delane Ave from Wright Ave to approximately 80 ft past Castleton Rd.  Drainage and water line improvements will be made along Castleton Rd from Delane Ave to Lomax Ave.  Improvements will consist of new drainage structure, new pipe alignments, curb and gutter along Delane Ave, and the extension of a 6” water line down Castleton Rd.

 

Collective AB Storm Drainage Improvement Project

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.

Craighead/Tryon Storm Drainage Improvement Project

The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

Gaynelle Storm Drainage Improvement Project

This project is located on Gaynelle Drive between Langley Circle and Running Wood Lane. The existing drainage system consists of open channel and a culvert under a city-maintained road. The culvert system is experiencing blockages and is prone to flooding.

Collective T Storm Drainage Improvement Project

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects involve open channel and closed pipe system on private property and under city-maintained roads.

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.