Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

CMPD Animal Care and Control Phase 3 Expansion

The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia.  Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility.  The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society.  We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.

The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.

Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Firehouse #11 Replacement

Charlotte Firehouse #11 located at 620 W. 28th Street is one of the older CFD facilities. The building has a pressing need for repair and upgrades. This project will remove and replace the existing firehouse with a facility which meets modern day needs.  The project will produce a new 17,000 SF, 4-bay two-story firehouse.

Storm Water Repair and Improvement FY2024-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.