Specialized Roadway Construction FY22C

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction Services FY22A

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.

I-277 Rail Trail Bridge – Construction

This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform.

FY2020 CATS Bus Stops Improvements

Install American with Disabilities Act (ADA) compliant bus stops in various locations throughout Charlotte. The bus stop locations are: 1003 Toddville Rd.; 5141 Freedom Dr.; 10610 Westlake Dr.; 10023 Callabridge Ct.; 9800 Callabridge Ct.; 9729 Callabridge Ct.; 6219 Monroe Rd.; 6103 Fairview Rd.; 4536 Sharon Rd.; 1420 N. Tryon St.; 116 Dalton Ave.; and Tryon St. @ White Hall Commons.

Backlot Trail

This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.

DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.

Sandy Porter S Tryon Intersection Improvements

This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.

Lakeview-Reames Intersection Improvement and Sidewalk

This project will provide a roundabout at the intersection of Lakeview Road and Reames Road, and a sidewalk on Lakeview Road between Beatties Ford Road and Reames Road. This project is located in the Beatties Ford Road Comprehensive Neighborhood Improvement Program (CNIP) Area.