Water Transmission Mains – Assessment -CANCELLED

The task is to evaluate the state of the water pipes that carry water throughout the Charlotte Water System. The evaluation will mainly focus on prestressed concrete cylinder pipe, which is a type of pipe that has a concrete core, a steel cylinder, and high tensile wires. However, the evaluation may also cover other types of pipe materials.

-Cancelled due to reprioritization of projects

Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED

This project consists of the design and construction of a gravity outfall along Beaverdam Creek West Branch. This outfall is a tributary to the existing Beaverdam Creek Lift Station and Force Main. Phase 2 is approximately 2,100 linear feet of pipe and will continue from the anticipated Phase 1 West Blvd extension north to a terminus near I-485. This project will accommodate economic growth in the River One area by expanding the wastewater collection system.

Cancelled as of 1/18/2024

Water Main Replacement Bid Package

Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12 inches and smaller.

Water Main Replacement FY24

Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12” and smaller.

FY24 Large Service Contract #1

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

FY25 Large Service Contract #1

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

FY25 Small Service Contract #1

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.

Belmont Force Main Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.